Hilti Power Plant Upgrade Dubai, UAE

CLIENT

Hilti Emirates

Savings (AED/Year)

475,000

Scope of work

Generators Optimization /Dewa Upgrade

ENERGY | RENEWABLE ENERGY

Hilti Power Plant Upgrade

Hilti head office located in Dubai Investment Park is a clear example of the possibilities created by AMANA’s Energy-Saving team to continuously improve on energy consumption.

CEM, CMVP and PCF certified engineers were able to create a plan to reduce the facility’s carbon footprint by optimizing the diesel generators operation, then upgrading the DEWA’s transformer station to account for the whole facility’s electrical loads. AMANA’s team is in continuous support to maintain a smooth operation for Hilti’s power plant. Data collection and analytics are always ongoing to verify the energy savings achieved.

2021

Completion Year